Nutrient Neutrality Map

Interactive map showing catchment areas affected by nutrient neutrality across England

Nutrient Neutrality in England

Click on each catchment on the nutrient neutrality map for further information and whether phosphorus load, nitrogen load or both nutrient loads need to be mitigated before residential developments can proceed.

Nutrient Neutrality Catchments

Catchment

Nutrient(s)

Chesil and the Fleet

Nitrogen & Phosphorus

Esthwaite Water

Phosphorus

Hornsea Mere

Nitrogen & Phosphorus

Lindisfarne

Nitrogen

Oak Mere

Nitrogen & Phosphorus

Peak District Dales

Phosphorus

Poole Harbour

Nitrogen

River Avon

Phosphorus

River Axe

Phosphorus

River Camel

Phosphorus

River Clun

Nitrogen & Phosphorus

River Derwent & Bassenthwaite Lake

Phosphorus

River Eden

Phosphorus

River Itchen

Phosphorus

River Kent

Phosphorus

River Lambourn

Phosphorus

River Lugg

Phosphorus

River Mease

Phosphorus

River Wensum

Phosphorus

Roman Walls Loughs

Phosphorus

Rostherne Mere

Nitrogen & Phosphorus

Solent

Nitrogen

Somerset Levels and Moors (River Brue, River Parrett & River Tone)

Phosphorus

Stodmarsh

Nitrogen & Phosphorus

Teesmouth

Nitrogen

The Broads

Nitrogen & Phosphorus

StodmaWest Midlands Mossesrsh

Nitrogen & Phosphorus

How to Overcome Nutrient Neutrality

The first step is to establish which type of nutrients need to be offset to ensure nutrient neutrality — this will either be phosphorus (sometimes described as phosphates) or nitrogen or both. You will then need to calculate the nutrient budget for the development. There are two elements to the calculation: the load due to population increase (number and type of dwellings) and the load due to land change (from say agricultural field to residential urban use).

There should be nutrient calculators available from the local planning authority to assist. By entering details such as number of dwellings, connection to either a waste water treatment works (main sewerage) or package treatment plant (PTP), plus details on the size of the development site, soil type, rainfall and NVZ status, a nutrient budget figure will be generated.

One issue with fallowing land is that the change will need to be secured for at least 80 years with an S106 legal agreement — this quite often deters landowners due to cost and complexity. The preferred route for most developers is to offset the nutrient load by purchasing nutrient credits from approved credit schemes within the same catchment area.

Once you have decided how to overcome nutrient neutrality, the planning authority will require documentation that includes the calculation and details the proposed mitigation. The documentation required is likely to be a Nutrient Neutrality Assessment and Mitigation Strategy (NNAMS) and possibly a Shadow Habitat Regulations Assessment (sHRA). The LPA will then consult with Natural England and undertake a Habitat Regulations Assessment (HRA). If all is satisfactory then you have cleared the nutrient neutrality hurdle ahead of a planning approval.

Ready to Get Started?

Contact us today to discuss your requirements. Call us on 01749 372007.