Biodiversity Net Gain in Somerset: Delivering Enhancement on Development Sites

Implementing Biodiversity Net Gain on Somerset Development Sites

In Somerset, new developments now must not only avoid harming biodiversity but also deliver a measurable net gain in biodiversity on the site, or in combination with off‑site solutions. This requirement arises under the Environment Act 2021 and associated planning regulations, which mandate that any individual development must improve the ecological value of habitat compared to its pre‑development baseline.

For developers, landowners, ecologists and planners working in Somerset, understanding the mechanisms of BNG is key: how habitat value is measured, what on‑site options exist, when off‑site units are needed, and how long‑term management commitments are secured.

What is Biodiversity Net Gain (BNG) for Development Sites?

At its core, Biodiversity Net Gain for a development site means:

  • Establishing a “before” habitat baseline – an ecological survey determines the existing value of habitat (woodland, grassland, hedgerow, watercourse etc).
  • Using the statutory Biodiversity Metric (or small‑sites metric) to calculate how many “biodiversity units” the existing site holds, and how many units will remain/lost after development.
  • Implementing enhancements – either through on‑site habitat creation or improvement, or via off‑site purchase of units from habitat banks, ensuring a minimum net uplift (e.g., 10% gain) over the baseline.
  • Securing long‑term management – the created/enhanced habitats must be maintained for a minimum period (for example 30 years) under legal agreement.

For a development in Somerset, this means that it’s not enough simply to replace what’s lost; the aim is to leave nature in a better state than before.

Why BNG Matters for Somerset Sites

Although this article focuses on individual development sites (rather than catchment‑scale issues), delivering BNG has strong relevance in Somerset because:

  • The county contains many environmentally sensitive habitats—wet grasslands, hedgerows, ponds, small woodlands—that are each part of the ecological network supporting species and ecosystem services.
  • Failure to secure adequate biodiversity gain can delay planning approval, increase risk, or incur cost through purchasing off‑site units.
  • Good BNG delivery brings additional benefits: better quality green space for residents, improved habitat connectivity, resilience to climate change, and strengthening of local nature recovery.
  • As national policy shifts to more stringent biodiversity regulation, Somerset developers who integrate BNG effectively will gain a competitive advantage and regulatory confidence.

On‑Site vs Off‑Site BNG: What Somerset Developers Need to Know

On‑site Solutions

On‑site BNG means delivering habitat enhancement within the red‑line boundary of the development site. Options include:

  • Creating new woodland, hedgerow or aquatic habitats
  • Improving the condition of existing semi‑natural habitat
  • Wildlife‑friendly landscaping, ponds, and connectivity corridors. The advantage is that the biodiversity uplift is delivered locally, helping both the site and the local ecosystem. According to guidance: the developer should first seek to achieve BNG on‑site, before relying on off‑site solutions.

Off‑site Units & Habitat Banking

When on‑site gains are insufficient or not viable, Somerset developments may need to purchase off‑site biodiversity units. Some key features:

  • Off‑site units are created/enhanced elsewhere, by land‑owners or specialist habitat banks, registered on the national Biodiversity Gain Site Register.
  • Developers must comply with the “biodiversity gain hierarchy”: on‑site first, then off‑site, and statutory biodiversity credits as last resort.
  • Legal agreements ensure that off‑site habitats are managed for the required lifetime (30 years or more). Developers reserve units ahead of planning approval to reduce risk.

Steps for Somerset Development Sites to Deliver BNG

1. Ecological Baseline Survey – Engage a qualified ecologist to assess the site’s habitat types, condition, quantity and biodiversity value.
2. Calculate Biodiversity Units – Use the statutory biodiversity metric tool to assess the pre‑ and post‑development biodiversity unit values.
3. Design for Enhancement – Incorporate design features that enhance habitat: retention of natural features, new habitat creation, connectivity, management planning.
4. Assess On‑site Capacity – Determine how many units of gain can be delivered on‑site; if required units exceed what’s feasible, explore off‑site options.
5. Plan Off‑site Reserve (if needed) – If on‑site only cannot deliver full gain, reserve off‑site units early to avoid delays; prepare legal agreement.
6. Prepare Biodiversity Gain Plan – Submit this as part of the planning application to the Local Planning Authority (LPA), showing how BNG will be achieved, managed and monitored.
7. Secure Legal Management & Monitoring – Ensure legal agreements secure the habitat enhancements for at least 30 years; set up monitoring and reporting mechanisms.
8. Implementation & Maintenance – Deliver the enhancements, monitor over time, adapt management as required, and ensure compliance.

Benefits for Somerset Sites and Stakeholders

  • Regulatory Compliance – Meets national mandatory BNG requirements (such as 10% uplift) and local planning policies.
  • Improved Local Ecology – Enhances green space and connectivity, supports wildlife, and aids ecosystem resilience.
  • Community Value – Creates better habitat amenity for residents, improves landscape quality, and often boosts local biodiversity reputation.
  • Risk Mitigation – By delivering BNG effectively, developers reduce planning risk, avoid costly late offsetting and strengthen their project’s sustainability credentials.
  • Long‑term Management & Value – A well‑managed habitat enhancement can become an asset rather than a burden, contributing to environmental value and project legacy.

Frequently Asked Questions (FAQ)

1. What is Biodiversity Net Gain (BNG)?

BNG ensures that a development site leaves biodiversity in a better state than before. It requires measuring existing habitats, implementing enhancements, and managing them over the long term to achieve a measurable net gain.

2. Is BNG the same as environmental offsetting?

Not exactly. BNG prioritises on‑site habitat enhancement first. Off‑site units or credits are used only when on‑site improvements cannot deliver the required biodiversity uplift.

3. How is BNG measured on a Somerset site?

Developers use the Biodiversity Metric to calculate “biodiversity units,” comparing the pre‑development baseline to post‑development gains. This ensures that the minimum net gain (typically 10%) is achieved.

4. What habitats can contribute to BNG in Somerset?

Woodlands, grasslands, hedgerows, wetlands, ponds, and river corridors can all be created, enhanced, or restored to provide additional biodiversity units.

5. How long must BNG habitats be maintained?

Legally, enhanced habitats must be secured for a minimum of 30 years through management agreements or legal mechanisms, ensuring long-term ecological benefit.

6. Why is BNG important for Somerset developers?

Delivering BNG ensures regulatory compliance, reduces planning risks, improves site ecology, and adds community and environmental value to development projects.

Conclusion

For development sites in Somerset, Biodiversity Net Gain is both a legal requirement and an opportunity to improve ecological outcomes locally. By following a metric-based approach, prioritising on-site enhancements, and using off-site units when necessary, developers can leave each site in a measurably better ecological state than before.

BNG focuses on site-specific biodiversity improvements, distinct from catchment-scale measures like nutrient neutrality. When effectively implemented, it supports wildlife, ecosystem services, and local communities, aligning sustainable development with long-term ecological stewardship.

Need BNG Units or Phosphate Credits?

Contact us today to discuss your requirements. Call us on 01749 123456.

Leave a Reply

Your email address will not be published. Required fields are marked *